Add the things that live in the framing, foundation, walls or roof before the build starts: a covered patio, extra windows, a bedroom or bath option, ceiling supports, outlets and wiring. They're far cheaper now than after drywall. Skip finishes you can change later.

What to do before you build a house?

Before construction starts, settle anything that touches the structure. Once framing and drywall are done, these get expensive or impossible.

The options most often worth it:

  • Covered or extended patio. A patio ranked among buyers' most-wanted features in NAHB's 2024 survey, rated essential or desirable by 86%.
  • Room options. A flex room as a bedroom, a loft, or an extra bath, if the plan offers it.
  • Extra windows. More light, and harder to add later.
  • Ceiling fan supports and lights. NAHB found 81% of buyers want ceiling fans. Wiring and blocking go in during framing.
  • Outlets and circuits. In the kitchen, garage, outdoors and wherever you'll work or charge things.
  • Low-voltage wiring. TV, data and security, run before drywall.
  • Plumbing extras. A gas line for a grill or range, a utility sink, an extra hose bib.
  • Blocking. Wood inside the wall for TV mounts, grab bars or heavy shelves.

What not to upgrade when building a home?

Skip the things you can swap easily later:

  • Light fixtures and ceiling fan models (but do add the wiring and supports)
  • Faucets and cabinet hardware
  • Paint colors
  • Mirrors and accessories
  • Window treatments

And be careful with options that only you will value. A highly personal layout change can make resale harder.

What is the 30 rule of home renovation?

It's an informal rule of thumb, not an official standard. The version I hear most says not to spend more than about 30% of a home's value on renovations, because you're unlikely to get it back at resale. People also apply a smaller percentage to single rooms.

The useful idea behind it: spending a lot more than the neighborhood supports rarely pays back. On new construction, that's another reason to choose structural options that broad groups of buyers want, like a patio or an extra bath, over expensive one-off changes.

The cost of waiting

From my time on job sites: adding an outlet before drywall is a short task for an electrician. Adding it after means cutting drywall, fishing wire, patching, texturing and painting. A covered patio added later means permits, footings, roof tie-ins and matching materials.

That's why the structural option deadline matters. Ask your builder:

  • When is the deadline for structural options?
  • Which options require engineering or permit changes?
  • How do structural options affect the price and the timeline?

Check them before drywall

At your pre-drywall walkthrough, confirm every structural option you picked is actually there: the patio framing, the windows, the outlets, the blocking, the wiring. That's the last easy chance to catch a miss.

Who's writing this. I sell new homes for D.R. Horton at Collins Ridge in Hillsborough, so I represent the builder, not you. This guide is general education from my years on job sites and in sales. It isn't legal, tax or lending advice, and it doesn't describe any specific home, price or incentive. Check the sources linked below, and talk with your own lender, agent or attorney before you decide.

Looking at new homes in Hillsborough?

I sell new construction at Collins Ridge, about 20 minutes from Durham and Chapel Hill. Narrow the 12 floor plans to the two or three that fit, then come walk them with me.

See Collins Ridge · Not sure Hillsborough fits? Answer 7 questions

Sources

  1. Outdoor Features and a Laundry Room Among Most Wanted Features, NAHB Eye on Housing
  2. Pre-Drywall Inspections, InterNACHI
  3. Cost vs. Value 2025: South Atlantic, Journal of Light Construction